Base Coat: 3/8 to 1/2 inch (10 to 12 mm) of Warmcote™:
Apply the Warmcote in two passes with an integrated alkali resistant mesh.
A first pass of 3/16 to 1/4 inch (5 to 6 mm).
Hang the mesh vertically over the face of the plaster and squeeze in with the trowel.
The mesh must be the 3/8 inch x 3/8 inch (10 mm x 10 mm) hole option.
Close in with the second 3/16 to 1/4 inch (5 to 6 mm) pass, the mesh should now not be visible.
Flatten the Warmcote with a serrated feather edge, this will also provide the physical "key" for the next coat.
Ideally the Warmcote has started to set, but is not dry, when applying the Limecote™.
Finish Coat: 5/16 to 3/8 inch (8 to 10 mm) of Limecote:
The Limecote can be applied in one or two passes, two passes can be useful on larger areas or in drying weather conditions as it gives a little more control over how fast the wall pulls water out of the plaster.
Flatten off with a flexible straight edge, such as a flexible skimming blade, pulled across the face of the plaster at a shallow angle.
Finish with a flexible finishing trowel.
Our plasters do not require special care and treatment once finished, just protection from heavy rain.
Gutters should always be in place during and after plastering, in the absence of downspouts, a short section should be fitted to the gutter outlet and project out over the scaffolding handrail.
For late season work, please refer to our Winter Working Guide