Skip to main content

Case Study: Bacton, Stowmarket

Case Study: Bacton, Stowmarket

Future-Proofing a Suffolk Landmark: Bacton, Stowmarket

This remarkable Grade II listed (protected as a historic building in England) 16th century timber framed (post and beam) property in Bacton has recently undergone a highly skilled and sympathetic restoration, combining historical conservation with modern thermal performance.

The team carefully removed up to 2 1/4 inches (60 mm) of damaging sand and cement stucco before applying Steico Duo Dry wood fiber board directly onto the historic frame. Best of Lime supplied the materials for the upgrade, including Warmcote™ as a breathable base coat (moisture passes through as vapor and dries out) and Limecote™ for a beautifully smooth, flexible finish, ideal for traditional timber framed buildings.

Crafted by Matt Jolly and his team, the project is a shining example of how natural lime-based systems can protect and enhance period properties while preparing them for a low carbon future.

Download the full case study to explore the techniques and materials used in this exemplary heritage restoration.

Back to the blog